OPEXOPEX
CMO Strategic Partnership Program

Digital Twins for Molds.

Replace the $50K–$250K+ physical backup mold with a Virtual Backup Mold — a 100% digital, instantly activatable production backup held on OPEX's platform. Digital inventory on demand.

Physical
Steel injection mold tool sitting idle on a warehouse pallet

Idle asset · Storage · Re-qualification

$50K–$250K

Virtual
Green holographic wireframe digital twin of an injection mold above a server rack

Instant · No storage · Always current

$2K–$8K / yr

The redundancy problem

Most CMOs are contractually stuck.

Contract manufacturers are required to provide redundancy for critical plastic parts. Today, that means buying and maintaining a physical backup mold that sits idle — until it doesn't.

Today

Physical backup mold

  • · $50K–$250K capex per part family
  • · Dedicated storage and depreciation
  • · Periodic re-qualification cycles
  • · Sits idle until disaster strikes
With OPEX

Virtual Backup Mold

  • · 100% digital — no physical asset
  • · Same-day activation for qualified parts
  • · No depreciation, no re-qualification cycle
  • · Annual retainer per qualified part family
90–97%
Cost reduction
24–72 hr
First shipment
$0
Physical storage

The digital record

What OPEX permanently holds.

When a CMO qualifies a part on our platform, we retain the complete digital production record. Ready to run, always.

Part file

Locked geometry, revision-controlled.

Validated print profile

Machine, orientation, exposure, supports.

Resin lot qualification

Chemistry, batch, mechanical baseline.

Post-cure protocol

Cure dosimetry — time, intensity, environment.

Dimensional benchmark

First-article metrology and tolerance envelope.

Quality sign-off

Full inspection record, ready to audit.

How it works

From qualification to shipment.

  1. 01

    Qualify

    Validate geometry, resin, tolerances, and mechanicals on the OPEX platform.

  2. 02

    Twin stored

    OPEX retains the complete digital production record — indefinitely.

  3. 03

    CMO triggers

    The CMO declares an activation event through the OPEX dashboard.

  4. 04

    Certified shipment

    First shipment within 24–72 hours, fully inspected and signed off.

Activation triggers

Declared by the CMO. Activated by OPEX.

Equipment failureMaterial shortagePlant emergencySupply chain disruptionForce majeure

SLA tiers

Match redundancy to criticality.

Each tier is structured as an annual retainer per qualified part family, plus a per-activation fee.

Standard
72-hr response

Scheduled redundancy for non-critical part families.

Most common
Priority
24-hr response

Faster activation for revenue-critical parts.

Emergency
Same-day

Mission-critical parts with zero tolerance for downtime.

Cost comparison

90–97% less capital tied up.

Physical backup mold$50,000 – $250,000 + storage + re-qual
Virtual Backup Mold (annual retainer)$2,000 – $8,000 per part family / yr

The CMO's customer sees uninterrupted supply. The CMO's redundancy SLA is honoured — without a physical backup mold ever being purchased, stored, or re-qualified.

Preferred Manufacturing Partner Network

Turn every qualified part into digital inventory.

From vendor to structural ally. Let's map your critical part families and stand up their Virtual Backup Molds.

Become a partner